City of Missoula Fire Department Ramp Project

City of Missoula Fire Department Emergency Ramp Extension

Missoula, Montana
The City of Missoula Fire Department proposed to extend the existing emergency access ramp located along the Clark Fork River in Missoula to improve access for emergency rescue watercraft (RWC) to the Clark Fork River during low flows as well as improve safety for personnel launching and retrieving RWC.

Read More »
Black_Eagle_dam from southshore

Black Eagle 100kV Line and Substation Replacement Project

Black Eagle, Montana
The Black Eagle hydroelectric facility generates approximately 21 megawatts and is a run-of-the-river project owned and operated by NorthWestern Energy. The Black Eagle Project required the replacement of an existing, but aging 100kV-radial line and wooden H-frame structures.

Read More »
Cochrane Dam

Cochrane Dam Reservoir Sediment Excavation Project

Great Falls, Montana
Cochrane Dam is one of six hydroelectric facilities located on the Missouri River that is owned and operated (since 2014) by NorthWestern Energy. The facility began operation in 1958 and is a run-of-the-river project with a generating capacity of 64 megawatts.

Read More »